Active Projects
Port Management & Marine Contracting Div.
S. No | Project Name | Client Name | Project Location (City) | Start | End Date | Brief Project Scope |
---|---|---|---|---|---|---|
1 | Port Operations & Services Contract | Petro Rabigh - Petroleum Refineries Company | Rabigh | 2008 | 2028 | Port Operations & Services Contract |
2 | Rabigh Power Plant | Saudi Electric Company | Rabigh | 2018 | May/2021 | Maintenance Contract For Fuel Unloading Terminals At Rabigh Power Plant (Jetty No. 1 & 2). |
3 | Jeddah South Power Plant | Saudi Electric Company | Jeddah | 2018 | Aug/2020 | Maintenance Service Contract For Fuel Unloading Terminal Jetty At South Power Plant Rabigh |
Repair & Maintenance Engineering Div.
S. No | Project Name | Client Name | Project Location (City) | Start | End Date | Brief Project Scope |
---|---|---|---|---|---|---|
1 | Installation of overhead crane from NWPS to stage 1 chlorination | MASA-MARAFIQ | Jubail | 2021 | Jun/2021 | Complete Package for Installation, Testing & Commissioing of overhead crane from NWPS to stage 1 chlorination |
2 | Plant & Instrument Compressed Air System For Tank Farm-Swro & Bwro Equipment | Marafiq - Power and Water Utility Company for Jubail and Yanbu | Yanbu | 2018 | Jan/2021 | To Install An Independent And Permanent Plant And Air Compressed Air System For Tank Farm SWRO-1 And BWRO Equipment |
3 | Conversion Of Ge Frame 7Ea Gas Turbines To Fire On Crude Oil As Main Fuel At Tabouk - 2 And Al Wadjh Power Plants | Saudi Electricity Company | Tabouk & Al Wajh | 2018 | Dec/2020 | To Convert 12 Frame 7 GE Gas Power Generation Turbines From Diesel Oil To Crude Oil In Tabouk And Al Wajh. Scope Involves Fabrication And Assemblies Of Crude Oil Forwarding Skids,. Electrical Activities Include MV Switch Gear Extension, New LV, MCC Switchgears Installation Etc. Civil Works Include Foundations, Skids Sheds, Control Rooms Construction, Cotp Structure And Cranes Installation, Trenches And Duct Banks Etc. I&C Activities Includes Supply And Installation Of Instruments As Per Developed System Philosophy And Control Logics, Cable Laying And Termination, Mark VI 'E' Integration, IOS Assignments And Graphics Modification. Testing And Commissioning As Per GE Recommendations. |
4 | Conversion Of Gas Turbine #4 And Gas Turbine #5 From Deisel Fuel To Crude Fuel At Sharourah Power Plant | Saudi Electricity Company | Sharourah | 2017 | Dec/2020 | Complete EPC Project To Put Into Service Two GE MS7001EA Units (GT#4, GT#5) Located At Sharourah PP To Be Capable For Continuous Crude Oil Firing As The Main Fuel While Keeping The Distillate As Alternative Fuel. |
5 | Rehabilitation Of Fuel Unloading Skids | Saudi Electricity Company | Sharourah | 2015 | Dec/2020 | To Replace Fuel Unloading Skids # 3 & 4 With New Skids And Transfer Fuel Unloading Skids # 1 & 2 To The New Loaction In Sharourah Pp. |
6 | Construction Of New Floating Pontoon | Petro Rabigh - Petroleum Refineries Company | Rabigh | 2019 | Dec/2020 | Installation Of New Floating Pontoon And Fuel & Water Forwarding System For Costguard Ships With Associated Firefighting Systems |
7 | Fire Fighting System Phase Four | Saudi Electricity Company | South Region (6 Cities) | 2015 | Dec/2020 | Design, Engineer, Procure, Supply & Deleiver Materi Also And Equipment To The Worksites Install, Construct, Testand Commision Fire Safety Parameter In SEC-SOA, Phase Four As Described. |
8 | Technical Services For Cranes And Hoists with Saudi electricty Power Plants | Petro Rabigh - Petroleum Refineries Company | Central Region | 2016 | Sep/2020 | To Perform Inspection, Test And Repair Of Cranes And Hoists In Accordance With The Original Equipment Manufacturer'S Standard Procedures Work And In Accordance With The Requirements. |
9 | Rehabilitation, Testing And Commissioning Of Marine Oil Terminal-Jetty No. 2 At Rabigh Power Plant | Saudi Electricity Company | Rabigh | 2019 | Aug/2020 | Rehabilitation And Full Restoration Of Marine Oil Terminal Jetty No. 2. Fully Check And Inspect The Jetty Installed System, Design, And Engineering Of Systems, Rehabilitate Existing Installed Equipment And System, Make Necassory And Corrective Maintenance, Test And Commission Of Jetty And Make It Fully Fuctional And Auto Operational To Unload The Specific Fuels. |
10 | W-6 Maintenance & Overhauling of MTU Engines of WADIAH SHIP | Coast Guard | Jizan | 2017 | Feb/2020 | Ship repair, Major overhauling of MTU Engines, Generators and testing of engines on our Dynamometer and Sea Trial. |
11 | W6 AL YAMAMAH MTU ENGINE MAJOR OVERHAULING | Coast Guard | Jizan | 2019 | Jan/2020 | Ship repair, Major overhauling of MTU Engines, Generators and testing of engines on our Dynamometer and Sea Trial. |
12 | Red Sea Gate Terminal Jeddah Damaged Pontoons Renewal | RSGT - Jeddah | Jeddah | 2019 | Jan/2020 | Rehabilitate pontoon structures. |
13 | Supply & Instalation Of Plate Form at Nomac Shuqaiq PP | NOMAC | Shuqaiq | 2019 | Dec/2019 | Design, Fabricate, Supply and Install a structure under Berth for the maintenance of FF Engine driven pumps. |
14 | Tiemaa Yacht Ship Maintenance & Repair | SKAR | Jeddah | 2017 | Oct/2019 | Refit of yacht. Maintenance of Engines. Repair of Propeller shafts. |
15 | Repairing of Main Pump Impellers | KSB ARABIA | Yanbu | 2018 | Jun/2019 | Rewelding and Repair of Duplex Steel Impellers. |
16 | Cranes Maintenance Project At SWCC Shuqaiq Power Plant | SWCC SHUQAIQ | Shuqaiq | 2016 | Jan/2019 | Maintenance of 100Ton EOT Overhead, 55Ton Semi Gantry and 20Ton EOT Overhead Cranes. |
17 | Supply & installation of crane At Hail PP ( Service Order # 8500401535). | Saudi Electricity Company | Hail PP | 2018 | Dec/2018 | Design and construct Structure. Procure and install crane. |
18 | Dismantling and Installation of New Diesel Engine and Pump At NOMAC Jety Shuqaiq | KSB ARABIA | Shuqaiq | 2018 | Dec/2018 | Dismantling old Diesel Engine and installation of new engine. Design, Fabricate, Supply and Install a structure under Berth for the maintenance of FF Engine driven pumps. |
19 | DCNS Paintshop Rehabilitation | DCNS - Naval Base | Jeddah | 2017 | Aug/2018 | Repair of HVAC and Paintshop Machines. |
20 | Modification Of Generator Cooling System Of Gt #8 To 10 At Tihama Power Plant Contract #4400004692 | Saudi Electricity Company | Tihama PP | 2015 | Jan/2018 | Clients gas turbines are situated at a location nearing desert and sea, and where sandstorms are common. The cooling system of subject GE generators is an Open Ventilated one. The Generator rotor fans take air via filters and discharge the air across Stator and Rotor. The air then exits from the generator high pressure region opening in the base to the load coupling compartment thereby cooling it with hot but large airflow. Due to atmospheric/ambient conditions the filters get choked, regardless of the working back pulsation cleaning system. For the first time in known history, an OEM project was awarded to a non-OEM contractor, which is our company MSCL. The project involved new design for charge air coolers, air-cooled heat exchangers, and cooling system; Fabrication and procurement for the system; removal of existing Open Ventilated System; Installation of new system with independent control system and integration to Mark VIe turbine control system; Generator Seal Leakage repair and Bus Ducts Seal installation and repair. Successful testing and commissioning of GT-8, 9 & 10 at Tihama Power Plant, Saudi Electricity Company. |
21 | Construction Of Chemical Laboratory At Tihama Power Plant Contract #4400000733 | Saudi Electricity Company | Tihama PP | 2015 | Jan/2018 | Design and Construction of RCC Building. |
22 | Construction Of Tool Building At Sharurah Power Plant Contract #4400001372 | Saudi Electricity Company | Sharourah | 2015 | Dec/2017 | Design and Construction of Steel Structure Building for Tools and Equipment storage. |
23 | Design, Supply, Installation, Testing & Commissioning Of 01 New Compact Package Diesel Generator For Jeddah 4 - Plant, 3 Phase, 13.8KV, 60Hz, 2.5 MW Contract #JD/RE/871 | SWCC JEDDAH | Jeddah | 2015 | Nov/2017 | Construction of new Power Plant (Black Start Diesel Genset). Involves Civil Construction of Building, Steel Structures, Supply of Fuel Skids, Fuel Tanks, Switchgears, etc. |
24 | Service Water Pump Project At Najran Power Plant | Saudi Electricity Company | Najran PP | 2018 | Dec/2016 | To Perform Inspection, Test And Repair Of Cranes And Hoists In Accordance With The Original Equipment Manufacturer'S Standard Procedures Work And In Accordance With The Requirements. |
25 | Firefighting Extension Line Project At Gizan Power Plant | Saudi Electricity Company | Jizan | 2016 | Dec/2016 | Extension and Supply of New Piping network for Fire Fighting system. |
Projects & Specialized Trading Div.
S. No | Project Name | Client Name | Project Location (City) | Start | End Date | Brief Project Scope |
---|---|---|---|---|---|---|
1 | P-4194 Fuel Oil Unloading Jetty At Shuqaiq NOMAC | First National Operation & Maintenance Company (NOMAC) | Shuqaiq | 2019 | Open | Dismantling Old And Supply, Fabrication And Installation Of New Jetty Platform |
2 | P-4202 Marine Loading Arm Problem At Shoaibah Plant | Saline Water Conversion Corporation (SWCC) | Shoaibah | 2019 | Open | Repair And Refurbishment Of Marine Loading Arm. |
3 | P-4242-B Supply, Fab. & Installation Of Silencer Duct Cassettes (2Nd Shutdown). | First National Operation & Maintenance Company (NOMAC) | Shuqaiq | 2020 | Nov/2020 | Removal Of Old And Supply, Fabrication & Installation Of New Silencer Duct Cassettes. |
4 | ARC COATING | TRONOX | Jeddah | 2020 | Jun/2020 | Chesterton Arc Coating - Sand Milling Machine |
5 | P-4146 Jeddah 31 Port VSP Repair Materials (Voith) | A. A. Turki Group (ATCO) | Jeddah | 2019 | Jun/2020 | Voith Marine (Germany) Provision Of Parts And Specialized Engineering Services |
6 | P-4147 Jeddah 31 Port GB Repair Materials (Voith) | A. A. Turki Group (ATCO) | Jeddah | 2019 | Jul/2020 | Voith Marine (Germany) Provision Of Parts And Specialized Engineering Services |
7 | P-4279 Jeddah 31 Stbd (VSP+GB Selective Materials (Voith) | A. A. Turki Group (ATCO) | Jeddah | 2019 | Jun/2020 | Voith Marine (Germany) Provision Of Parts And Specialized Engineering Services |
8 | P-4091 Jubail 26 Repair Materials (Voith) | National Port Services, KSA (NPS) | Jubail | 2020 | Jul/2020 | Voith Marine (Germany) Provision Of Parts And Specialized Engineering Services |
9 | P-4213 Aramco Eastern Reagion Voith Fleet Healthcheck | Zamil Offshore / ARAMCO | Ras Tanura | 2019 | Jun/2020 | Voith Marine (Germany) Provision Of Parts And Specialized Engineering Services |
10 | P-4291 Rabigh 1 BSS Change Kit | Petro Rabigh Div. | Rabigh | 2019 | Jun/2020 | Voith Marine (Germany) Provision Of Parts And Specialized Engineering Services |
Electro Mechancial & HVAC Div.
S. No | Project Name | Client Name | Project Location (City) | Start | End Date | Brief Project Scope |
---|---|---|---|---|---|---|
1 | New Fais BSP | Hyundai Company | Jeddah | 2021 | Dec/2022 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
2 | 16 P S/S | Siemens Saudi Arabia | Jeddah | 2021 | Dec/2022 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
3 | Wali Liya | CEPCO | Jeddah | 2021 | Jun/2022 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
4 | HVAC Work at Petro Rabigh | MMC | Jeddah | 2020 | Dec/2021 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
5 | Fursan General Hospital | Ministry of Health | Farasan | 2021 | Jun/2021 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
6 | Jeddah Prince Fawaz Hosing 380 BSP | Hyundai Company | Jeddah | 2020 | Oct/2020 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
7 | Provision Of A/C Units For Saudi Air Navigation Services | Saudi Air Navigation Services (SANS) | Jeddah | 2020 | Aug/2020 | Provision Of Multi Types Of A/C Units For All Kingdom Airports Navigational Facilities Buildings |
8 | Air-Conditioning System For Dammam Food Laboratories | General Authority for Food & Drugs | Dammam | 2020 | Aug/2020 | Replacement Of Old Chilled Water System |
9 | Jeddah National Hospital, Ghulail | Jeddah National Hospitals | Jeddah | 2020 | Aug/2020 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
10 | Jeddah National Hospital, Makrona | Jeddah National Hospitals | Jeddah | 2020 | Aug/2020 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
11 | Air-Conditioning System For Hajj & Umrah Terminal At King Abdul Aziz International Airport At Jeddah | General Authority for Aviation - King Abdul Aziz International Airport | Jeddah | 2020 | Jul/2020 | Design , Supply , Installation , Testing & Commissioning Of Water Cooled Chilled Water System (2500 TR) With Cooling Tower , And Underground Pre-Insulated Chilled Water Pipes Networks With Associated E/M & Control Works. |
12 | Taif PHC | Ministry of National Guard | Taif | 2020 | Jul/2020 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
13 | Jeddani Hospital | Shaik Shali | Jeddah | 2020 | Jul/2020 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
14 | DCC, Makkah | Siemens Saudi Arabia | Makkah | 2020 | Jul/2020 | Complete Planning, Installation, Fabrication, Commissioning of HVAC Scopes of Works |
15 | M&O For Central Air-Conditioning System At Armed Forces Hospital At King Abdulaziz Navel Base At Jubail | General Administration for Medical Affairs of Armed Forces | Jubail | 2020 | Feb/2020 | M&O For Chillesr & Chilled Water Pumps Plants With Related Contol |
Offshore Marine Div.
S. No | Project Name | Client Name | Project Location (City) | Start | End Date | Brief Project Scope |
---|---|---|---|---|---|---|
1 | Sea Water Intake Pit Cleaning - Qurayyah Independent Power Project | NOMAC | Qurayyah | 2020 | Apr/2021 | Cleaning of Seawater Intake Collection Pits (2 Nos.) North and South and CRBS NO. 1 |
2 | Sea Water Intake Pit Cleaning - Qurayyah Independent Power Project | NOMAC | Qurayyah | 2020 | Feb/2021 | Cleaning of Seawater Intake Pits (2 Nos.) North and South |
3 | Supply & Installation of Marine Fenders & Thermal Camera’s For Seaview Of Jizan University Hotel | Higher Education Fund | Jizan | 2020 | Dec/2020 | Supply and Installation of - Floating Barrier - 772 m - 2 Nos. CCTV |
4 | Neom Bay Environmental Surveys | AESG Project Development | NEOM | 2020 | Oct/2020 | ROV underwater Footage NEOM |
5 | Barrier System Installation | HALO Maritime Defense Systems Inc. | Jizan | 2020 | Aug/2020 | Installation of Barrier |
6 | Construction of New Floating Pontoon for Coast Guard Boats | Petro Rabigh | Petro Rabigh | 2019 | Sep/2020 | Dredging / Excavation of Marina up to 3 meter. Construction of Breakwater and Shore protection using rip rap Fuel and Storage Tanks / Light Poles / Fire Suppression System / Parking - 8 vehicle parking shed / Access Road / Compaction with 15 cm aggregate |
7 | Rental of 9 Divers and ROV Equipment & Team at Sandala Island | Huta Marine Works Ltd. | Sandala Island | 2019 | Nov/2019 | Rental of 9 Divers and ROV equipment |
8 | Survey Works | Ultra Computer Services | Jizan | 2019 | Sep/2019 | Dept sounding at 50-meter interval with time stamp, along the intended barrier installation line, as well 25 m inboard and outboard of the line, including end points and the midpoint Jetty (M) Investigate and catalogue depth around the pilings at bottom of rock wall at northern end (N). Determine bottom composition at 50 m intervals along the barrier line |
9 | Underwater Anode Installation - Jizan Refinery and Terminal Project | Hanwha Saudi Contracting | Jizan | 2019 | May/2019 | Underwater Anode Installation - 163 nos / Welder test and report submission / SPM Work / Zodiac Boat and Passenger Boat support |
King Abdulaziz University Div.
S. No | Project Name | Client Name | Project Location (City) | Start | End Date | Brief Project Scope |
---|---|---|---|---|---|---|
1 | Maintenance & Operation for Both Marine Units R/V Al Azizi & Ulom Al Behar | King Abdulaziz University | Jeddah | 2017 | Dec/2023 | Vessel Management And Operation Including Maintenance And Crewing |
Commercial Diving Div.
S. No | Project Name | Client Name | Project Location (City) | Start | End Date | Brief Project Scope |
---|---|---|---|---|---|---|
1 | 1.Cleaning guides, install stop logs and seal joints, 2.remove & reinstall chlorine injection line, clean, 3.repair & replacement of oil boom |
Marafiq Power and Water Utility Company for Jubail and Yanbu | Power and water utility company for Jubail and Yanbu(Marafiq-Yanbu) | 2021 | Aug/2025 | This Is A Five Years Contract For Underwater Cleaning Cleaning guides, install stop logs and seal joints, For Marafiq Yanbu. |
2 | Underwater Cleaning Of Seawater Intake Screens | Saline Water Conversion Corporation (SWCC) | Al Wajh, Farasan, Al Qunfudah, Rabigh, Umlujj, Al-Lith | 2019 | Oct/2021 | This Is A Two Years Contract For Underwater Cleaning Of Seawater Intake Screens For SWCC - Satellite Desalination Plants. |
Makkah Contracting / Spare Parts Div.
S. No | Project Name | Client Name | Project Location (City) | Start | End Date | Brief Project Scope |
---|---|---|---|---|---|---|
1 | D15-South Border Infrastructure Project - Ar'redah- Jizan | Rabal Al Ali Co. (MOI) | Ar'redah- Jizan | 2021 | Dec/2021 | Supply And Installation Of HVAC System |
2 | D15/P-South Border Infrastructure Project - Wadeah | Rabal Al Ali Co. (MOI) | Wadeah | 2019 | Oct/2021 | Supply And Installation Of HVAC System |
3 | D15-South Border Infrastructure Project - Sharurah | Rabal Al Ali Co. (MOI) | Sharurah | 2019 | Sep/2021 | Supply And Installation Of HVAC System |
4 | D14P-South Border Infrastructure Project - Al Khore | Telad Investment Co. (MOI) | Al Khore | 2019 | Sep/2021 | Supply Of HVAC Parts (OEM and Certified Parts) |
5 | D14-South Border Infrastructure Project - Al Akhsheem | Telad Investment Co. (MOI) | Al Akhsheem | 2019 | Oct/2020 | Supply Of HVAC Parts (OEM and Certified Parts) |